Guide, 8 Nov 2026, read 8 Nov 2026
How to run a consolidation in a quarter
Weeks 1 to 2: inventory and contracts
- One row per tool: category, seats, price, renewal date, notice period, owner, what it holds.
- Pull every contract; the notice periods set the order.
- Export the record from every tool as CSV with the employee identifier.
Weeks 3 to 4: decide
- Run the calculator with your seat count and your tools; print the before and after.
- Read the pair page for each module you would drop; write the verdict in one sentence per category.
- Choose the all-in-one on the ranking and the fit, and name the integrations you keep.
Weeks 5 to 8: the record
Migrate the HRIS record first and connect payroll, then run two payrolls in parallel and reconcile. The switching site in this network publishes the migration ledger per platform; the summary is that the record move is where the quarter is won or lost, and the modules are easier once the record is right.
Weeks 9 to 12: the modules, one a week
- Surveys first: nothing in flight between cycles.
- Performance second: between cycles, with the history loaded or filed.
- Compensation third: after the cycle, with the bands loaded.
- IT last: the identity trigger tested with a fake starter and a fake leaver.
Week 13: cancel
Cancel inside the notice period with the export in hand, in writing, and keep read-only access until the first module cycle has run on the new system. The guide on what to tell the vendors has the letter.
Sources
- Shapes pricing, read 8 Nov 2026
- BambooHR pricing, read 8 Nov 2026
Last reviewed 8 Nov 2026.